Live Build — Updated as it happens

WE BOUGHTA BUS.

MEET THE BUS. Somewhere at an undisclosed location, there is a bus. Right now, it looks mostly like a bus. That’s temporary. The plan is to turn this thing into a rolling NoshPit—a working sandwich kitchen with a stage built into the side, ready to show up at festivals, parties, shows and wherever else they’ll let us park it. It’s going to take some cutting, welding, questionable decisions, good friends, a little money and probably several trips to the hardware store for shit we forgot. But when it’s finished, we’ll have something the old NoshPit could never be: Free to move. Free to show up. Free to get weird. No giant building to feed. No waiting around for people to find us. Just a bus, a stage, some loud music and a whole lot of sandwiches. CURRENT LOCATION: Undisclosed CURRENT CONDITION: Definitely a bus FINAL FORM: NoshPit FOLLOW THE BUILD →

Tom's property · undisclosed Locatio, OR

WHERE WE'RE AT

5% Complete

Phase 1: Clearing the bus. Tom's property, Indiaclosed Location, Or

Start25%50%75%Road Ready

THE PHASES

01

The Idea & The Bus

Done

We had an idea. We found a bus. It was on Tom's property in Silverton. It was full of years of storage and his kids' stuff. We shook hands. We're doing this.

Aug 3, 2026

Bus located on Tom's property in Silverton, OR. 1999 Blue Bird All American. 189k miles. Tom has been with us from day one — keeping it on his land and helping build it was the only logical next step.

Aug 5, 2026

First walkthrough done. The bus is full. Years of storage. Tom's kids' stuff. Random junk. It's a project. We love it.

Aug 6, 2026

Handshake deal locked. Tom is officially crew. The NoshPit Bus Build has begun.

02

Strip & Clear

In Progress

Right now we're emptying everything out. Every seat, every piece of storage, every mystery item left behind. The bus needs to be a blank canvas before we can make it anything.

Aug 2026

Started clearing the interior. Years of accumulated storage coming out piece by piece. Tom's been hauling with us every weekend.

Ongoing

Seats out. Panels next. Finding things we didn't expect. Choosing not to ask questions.

Coming soon

Full strip complete. Floor inspection. Subfloor assessment. Then we start building.

03

Structural & Insulation

Up Next

Once the bus is empty, we frame the kitchen zone, cut the service window, and get spray foam insulation in. This is where it starts looking like something.

TBD

Kitchen zone framing and service window cut planned. Spray foam insulation to follow.

Aug 18, 2026

Spray foam insulation scheduled for next week. R-value nerd hours.

Aug 20, 2026

Electrical rough-in started. Running conduit for kitchen, sound, and exterior lighting circuits.

04

Kitchen Build-Out

Up Next

The whole point. Commercial-grade prep surfaces, a flat top, a sandwich rail, and a hood system that actually works.

TBD

Equipment list finalized. Sourcing used commercial gear where possible.

05

Sound & Electrical

Up Next

The part that makes this more than a food truck. PA system, stage lighting, generator hookup, and a proper sound booth.

TBD

Sound system spec in progress. Targeting 2kW RMS for outdoor events.

06

Paint & Wrap

Up Next

Dolores gets her look. Full exterior paint or vinyl wrap — still deciding. Either way, she's going to be unmistakable.

TBD

Design concepts in progress. Leaning toward a full paint job over wrap.

THE PHOTOS

Every week, more photos. Drop in and watch Dolores become something.

Bus interior during conversion
Welding during bus fabrication
Kitchen equipment installation
Electrical wiring installation
Exterior paint work

More photos coming

Updated as we build

THE VIDEOS

GET BUILD UPDATES

Drop your email. We'll send you a note when something major happens — new phase, big milestone, or when Dolores finally gets her paint.

WANT TO HELP?

Every dollar goes directly into the build. No overhead, no middleman. Just Dolores getting closer to the road.

The NoshPit

Portland, OR

© 2026 The NoshPit. All rights reserved.